HVDC Schedule changed from 325 to 459 at 20:43 due to transmission constraints.
|
Schedule ChangeHVDC Schedule changed from 325 to 459 at 20:43 due to transmission constraints. HVDC outage completed 5-12-12wind curtailment has been cancelled. HVDC outage 5/12/12 8am – 18:00 or ?Young 2 ok for full load, oliver & Bison wind curtailed to zero. HVDC outageOutage priority: Opportunity Planned start: 5/12/12 0800 HVDC Pole 1 & 2Released for full load MP HVDC1030….released to follow Young2 net as it picks up load! MP HVDC0834…to 50 mws per pole ufn per MISO. loss of Young#2 Schedule limit will be updated after MISO ND study Center-Arrowhead HVDC0500….Pole 1 & 2 good for full load. |
|||||||||||